Electrical Upgrades, Area B
Replaced a loop-fed 6.9 kV distribution system with a new 15 kV system and installed a new 100 MVA power transformer — across 60+ buildings.
Project Details
- Owner
- U.S. Army Corps of Engineers, Louisville District
- Role
- Prime Contractor
- Contract Value
- $3,916,000.00
- Status
- Completed · awarded FY 1996
- Job #
- 596
Project Overview
Overstreet replaced the existing loop-fed 6.9 kV distribution system with a new 15 kV distribution system and installed a new 100 MVA power transformer in the existing substation.
The work required a complex construction sequence using new and existing pad-mounted switches to replace medium-voltage cabling in stages, re-tapping existing transformers during numerous scheduled outages in sequential order.
Scope Highlights
- New 15 kV cable, duct banks, street crossings, concrete and asphalt saw cutting, demolition and patching
- Pre-cast manholes, cable racking, insulators, cable fireproofing and grounding counterpoise
- Concrete-encased duct banks, terminations, load-break and dead-break elbows
- Re-tapped existing pad-mounted and unit substation transformers
- Replaced switchboards, panelboards and dry-type transformers in more than 60 buildings
Outcomes
- Delivered across 60 buildings without service interruption
Legacy project performed by the predecessor firm, Overstreet Electric Co., Inc.
More work like this
Feeder 5 Electrical Upgrades
Design-build modification of the existing 13.2 kV overhead distribution system on Fort Sill, improving the reliability and safety of the installation's electrical network.
Replace Transformer SS-849 & Panel CP
Fast-track replacement of a unit substation with stainless-steel equipment, executed within a single 8-hour scheduled outage.
Modifications to Electrical Distribution System
New Central Energy Plant for the Fort Knox hospital with two 2.5 MW 15 kV generators, paralleling switchgear and five miles of rebuilt overhead distribution.